276°
Posted 20 hours ago

CESMM4: Civil Engineering Standard of Method and Measurement: Civil Engineering Standard Method of Measurement (CESMM4 Series)

£9.9£99Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

Definitions 7.1. For the purposes of this section the following words and expressions shall have themeanings hereby assigned to them. Where an item description compiled in accordance with the Work Classificationwould be insufficient to identify clearly the particular work covered by the item The object of the work has been to make improvements while retaining the goodfeatures of the previous edition of the standard method of measurement. The principalimprovements sought are Additional description given for an item in accordance with paragraph 3.9 is notrepresented by the code number. Where code numbers are used as item numbers a suffixnumber shall be used to distinguish items which have the same code number but differ-ent additional description, for example

any form or by any means, electronic, mechanical, photocopying or otherwise, without the priorwritten permission of the Publisher, ICE Publishing, 40 Marsh Wall, London E14 9TP. d ) to take account of new techniques in civil engineering construction andmanagement, their influence on the work itself and on the administration ofcontracts. Quantities 5.19. The quantities shall be computed net using dimensions from the Drawings, unlessdirected otherwise by a measurement rule in CESMM4 or by the Contract, and noallowance shall be made for bulking, shrinkage or waste. Quantities may be rounded upor down where appropriate. Fractional quantities are not generally necessary and shouldnot be given to more than one place of decimals. J. K. Banyard OBE, FREng, FCGI, BSc(Eng), FICE, FCIWEMR. Beales, Barrister at LawW. Edwards BSc, Dip Arb, FICE, FCIHT, MCInstCES, FCIArb

Who wrote this?

A8 The composition, locationand details of testing shall bestated in item descriptions forsoil mailing. Finally CESMM4 retains essentially the same principles as when the document was firstpublished, and it is a great tribute to the authors of that first edition that they were able The committee is indebted to Dr Barnes of Coopers and Lybrand Deloitte for hisinvaluable advice and assistance throughout. Depth not exceeding 5 m m2 Depth: 5–10 m m3 Depth: 10–20 m m4 Depth: 20–30 m m5 Depth: 30–40 m m6 Depth: stated exceeding 40 m m

Measurement rules in the Work Classification set out the conditions under whichwork shall be measured and the method by which the quantities shall be computed ifother than in accordance with paragraph 5.19. M2 The Commencing Surfaceadopted in the preparation ofthe Bill of Quantities shall beadopted for the measurement ofthe completed work. comment to 71 representative bodies. Trial Bills of Quantities were prepared by 20organizations. Discussions with interested bodies continued throughout 1973 and 1974and the form of the present document owes much to the suggestions made during this Description of an item in addition to that required in accordance with paragraph3.1 shall be given where required by any provision of section 5 or by any applicableadditional description rule in the Work Classification. Where additional description isgiven, a separate item shall be given for each component of work exhibiting a differentadditional feature, for example A list of the principal components of the works with their approximate estimatedquantities shall be given solely to assist tenderers in making a rapid assessment of thegeneral scale and character of the proposed works prior to the examination of theremainder of the Bill of Quantities and the other contractual documents on which theirtenders will be based.D2 Invasive plant species shallinclude any plant whose controlis governed by legislation andwhich is treated by herbicidal orchemical process. Coding 4.1. For convenience of reference each item in the Work Classification has beenassigned a code number consisting of a letter and not more than three digits. The lettercorresponds to the class in the Work Classification in which the item occurs and thedigits give the position of the item in the first, second and third divisions of the class, forexample

the work of revision was undertaken by Martin Barnes, PhD, BSc(Eng), MICE,who worked initially under an agreement with the University of Manchester Institute ofScience and Technology and, after he left the University in 1972, under a direct C2 Item descriptions forexcavation shall be deemed toinclude removal of existing pipesof any material or diameter.

Preamble 5.4. The Preamble shall state the methods of measurement other than CESMM4, ifany, which have been adopted in the preparation of the Bill of Quantities and are to beused for the measurement of any part of the works. Such methods of measurement shallcomprise those adopted and to be used for any work not covered by CESMM4 and anyamendments to CESMM4 which have been adopted and are to be used. Amendmentscomprising abbreviation of CESMM4 are usually necessary for contractor-designed workand work which is intended to involve selection between alternatives at the discretion ofthe contractor. The extent of the work affected by all amendments to CESMM4 shall bestated in the Preamble. Excludes: Compaction (included in class E)Grouting carried out from within tunnels, shafts and other subterranean cavities (included in class T)Grouting carried out from within sewers (included in class Y) One item for precast concrete work shall not include more than one of the types ofconcrete unit listed in the first division of Class H, neither shall it include differentunits whose dimensions are not within one of the classifications listed in the seconddivision of Class H, nor shall it include different units whose mass does not lie withinone of the ranges listed in the third division of Class H.

Foreword to the first edition viiiForeword to the second edition ixForeword to the third edition xForeword to the fourth edition xi Final Surface’ means the surface indicated on the drawings to which excavation isto be carried out. Ranges of dimensions 5.15. Where all the components of work included in an item are of one dimensionwithin a range given in the Work Classification that dimension may be stated in the itemdescription in place of the range of dimensions given. A18 Item descriptions for triaxialcell and Rowe cell tests shallstate the number of incrementsand the effective pressures.

Provisional Sums for work executed on a daywork basis may be given comprisingseparate items for labour, materials, plant and other charges. Where a Daywork Scheduleof the form stated in sub-paragraph (b) of paragraph 5.7 is used each Provisional Sumshall be followed by an item for the adjustment referred to in that sub-paragraph. Theprice inserted against each such item shall be calculated by applying the percentageaddition or deduction inserted by the contractor in the Daywork Schedule to theamount of the associated Provisional Sum.

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment